An OEM pizza oven project needs one agreed product configuration, not a collection of features borrowed from different photographs. Choose the format, fuel setup, controls and included accessories together. Then link that configuration to the drawings, sample checks and packaging before authorizing production.
Is your range portable or patio-focused?
Describe the end user’s placement and handling needs, and your sales channel. The pizza oven collection includes portable and patio directions; a family name alone does not define the packed size, weight or operating layout.
For a camping or online retail range, ask about storage, handles, removable parts and the final package. For patio positioning, describe the intended support surface, door operation and front working space. Use the portable versus patio buying guide to make a shortlist.
The photographed format is a selection reference. Its exact configuration and included contents must be confirmed for your order.
Which fuel configuration are you asking to quote?
State the preferred fuel and the target country. For gas, include the gas type and supply pressure where known; unresolved items should be clearly marked for review. Do not assume one country’s gas setup covers every country in your launch plan.
PT-PG1600 documents gas, wood, wood-pellet and charcoal project options. Matching components and conversion arrangements must be confirmed; this does not mean all four configurations arrive as standard. Conversion is manual, with the oven off and completely cool, not a switch during firing.
Read the fuel-options guide before requesting multiple versions. Other models require their own fuel review.
Which controls and accessories belong to the order?
For PT-PG1600, manual mechanical rotation is the baseline and cordless motorized rotation is optional. The stainless steel and ceramic infrared gas burners are alternative project choices, not an assumed two-burner package.
Use a configuration list that separates the oven from optional tools, hose, bags and other accessories. Include quantities and the version or interface where relevant. A promotional bundle is not a packing list.
Swipe or scroll sideways to see all columns.
| Item to agree | Record in your brief |
|---|---|
| Product | Model or photographed format and drawing revision |
| Fuel | Ordered setup, target market and matching components |
| Rotation | Applicable model, manual or optional motorized version |
| Gas burner | The selected alternative, if applicable |
| Accessories | Named items and quantities, not “as pictured” |
| Brand and pack | Logo artwork, finish sample, languages and package contents |
What changes do you want for your brand?
Separate branding and finish changes from structural development. A logo, color or packaging request starts from the selected design. A new size, body shape, door or interface needs a defined engineering scope.
Use Your Brand, Our Designs (ODM) for an existing-model starting point, or OEM / Custom Engineering for a new design brief. Neither route establishes a universal minimum order or lead time.
Which sample checks should you request?
List the functional, appearance and packing checks your business needs. Specify who reviews the sample, what documents accompany it and how changes will be recorded before production.
If preheat or cooking performance matters to your positioning, ask for model-specific test conditions and results. Record fuel, starting conditions and measurement location. A thermometer reading does not establish the temperature of every point on the cooking deck.
Discuss target-market documentation with the responsible engineering or testing party. An existing report should be checked for the exact model and configuration rather than assumed to cover a changed oven.
What is the final approval pack?
Keep the approved drawing, configuration list, sample reference, artwork, manual and packing list together. Confirm packaged dimensions and weights for freight and fulfilment planning rather than estimating from a product photo.
Common mistakes are combining one model’s rotation with another model’s fuel claim, assuming every pictured accessory is included, and approving appearance without defining the fuel version. Use the general RFQ guide to add your company, quantity and launch plan to the technical checklist.
Prepare Your Inquiry